Monthly Archives: October 2016

Work Progress 2016-10-06


Block 1 – Continue install ceiling at sample unit 2016 10 05 Block 1 – Water tank installed Block 1 – After concrete then prepare to install HR drain Block 1 – Continue to install ceiling at sample unit 2016 … Continue reading

Posted in Uncategorized | Leave a comment

Work Progress


2016 08 26 Block 1 – New welding machine bought to site. Continue welding on 1st floor, 3rd unit. Block 1 – 1st floor Floor board installing. Block 11- Middle drain Continue another batch of drain cover Electrician installing wire … Continue reading

Posted in Uncategorized | Leave a comment