2016 08 25


Block 1 – Electrician fixing 1st floor wire. Block 1 – 2nd floor Floor board installed Block 11 – Drain continue bricks laying Architect come to site Advertisements

Posted in Uncategorized | Leave a comment

Work Progress


2016 08 24 Drain cover done and cover to Block 3 drain Block 11 – HR Drain installed and bricks work laying Welder Welding machine spoil Block 1 – Continue install floor board at 3rd unit 2016 08 23 Welding … Continue reading

Posted in Uncategorized | Leave a comment

Work Progress


2016 08 11 Block 1 – Welding and installing floor board at 3rd unit Cement delivered to site Block 3 – Bricks installing on the left side drain and start level and install HR drain for the right side drain … Continue reading